Toggle menu

Images

Images August 2021

Flythrough of the route 

Drive through of the route

Flythrough of SSTC phase 2 and Phase 3

See what the carriageway will look like:

SSTC3 Main scheme drawing over aerial imagery (PDF, 7 MB)

 

Share this page

Share on Facebook Share on Twitter Share by email